The challenge
Licence costs were rising and the ageing database was slowing down reporting. The business could not accept downtime during the move.
What we built
We redesigned the schema, built repeatable migration scripts, ran both databases in parallel with change-data capture, and verified parity table by table before cutting over in a planned window.
The outcome
The switch was invisible to users and reporting queries now run in seconds.